Rontan Australia
03.02.2011, 10:24
Rontan Australia tow truck/wrecker fit out Feb 2011
Hi everyone,
2009 Hino tilt-tray fitted out Tuesday with -
63" SaberLux-S
17" SquadLight-S
2x ONIX Quad Duo
6x Quasar DOTs
http://www.youtube.com/watch?v=Y0TVpQjXjsI
Controlled by 3 toggle switches with the ability to isolate the lightbar from the support lights.
Install time 4.5 hours including wiring up.
Cheers,
Dugald
Rontan Australia
'Be Seen - Be Safe'
Hi everyone,
2009 Hino tilt-tray fitted out Tuesday with -
63" SaberLux-S
17" SquadLight-S
2x ONIX Quad Duo
6x Quasar DOTs
http://www.youtube.com/watch?v=Y0TVpQjXjsI
Controlled by 3 toggle switches with the ability to isolate the lightbar from the support lights.
Install time 4.5 hours including wiring up.
Cheers,
Dugald
Rontan Australia
'Be Seen - Be Safe'